BHT Technology
 CONSTRUCTION OF 22KV OVERHEAD TRANSMISSION LINE UTILIZING THE BRANCHES FROM 110KV PHONG DIEN SUBSTATION
 CONSTRUCTION OF 22KV OVERHEAD TRANSMISSION LINE UTILIZING THE BRANCHES FROM 110KV PHONG DIEN SUBSTATION
 CONSTRUCTION OF 22KV OVERHEAD TRANSMISSION LINE UTILIZING THE BRANCHES FROM 110KV PHONG DIEN SUBSTATION
Project

CONSTRUCTION OF 22KV OVERHEAD TRANSMISSION LINE UTILIZING THE BRANCHES FROM 110KV PHONG DIEN SUBSTATION

  • Address
    XMXJ+M27, MY KHANH, PHONG DIEN, CAN THO, VIETNAM
  • Implementation Date
    03/09/2024
Project Location

Other Projects

VAN PHONG - NHA TRANG EXPRESSWAY OFFICIALLY OPENED TO TRAFFIC

METRO NO. 1 BEN THANH - SUOI ​​TIEN

VIEN DONG STEEL: FABRICATED MATERIAL SUPPLY PARTNER FOR THE DA LAT PROJECT

PROJECT OF DAI NGAI BRIDGE 2

BHT GROUP EFFORTS TO COMPLETE ACCEPTANCE TESTING FOR FPT EDUCATION COMPLEX HUÉ CONSTRUCTION PROJECT