Dang Thuc Vinh Street is the road connecting Cu Chi and Hoc Mon districts with Binh Duong, Tay Ninh and Long An provinces. The 5.3km long road was upgraded and widened from 7m, 2 lanes to 30m, 6 lanes, started construction in October 2018, put into use on April 26, 2022.